Client: Israel Roads Company Ltd. as contractor for Hasharon Diggers Ltd.

Project description:

The goal of the project was to turn the segment of Route 471 from the Gat Rimon Interchange to the Sha’ariya Interchange into an urban highway.

The project involved:

1. The Zerubavel Bridge (Gat Rimon), 63 m long and 32 m wide.

2. Sha’ariya Bridge with three exits, total length of 96 m and width of 61 m.

3. Kish Bridge – pedestrian overpass.

4. Acoustic walls.

5. Retaining walls.

6. Drainage ditches.

7. Signage supports.

8. Compliance with Jewish ritual law.

9. Load bearing walls.

Date of execution: August 2010-May 2013